SPARTAKOSPOOLS

Islands

Island pools: what changes across the sea

The build is the same, the logistics are not. This is how we bring a prefab pool to an island without surprises.

Prefab pool in Limnos beside a stone house
  1. The materials' journey

    Panels, braces, liner and equipment fit on one truck that boards the regular ferry. Where the road ends, the parts are carried by hand.

  2. Less water

    On dry islands we suggest, where it suits, 1.10 m panels instead of 1.50 m. The volume drops noticeably and filling is done by water truck.

  3. A few crew days

    The team travels only once every material has arrived. The build is short, and so are the accommodation costs.

  4. Salt and meltemi

    Stainless parts suited to sea air, a sheltered plant room, and a pool oriented so the north wind does not fill it with dust.

  5. When you leave

    Automatic pH and chlorine dosing and, if you wish, a local partner for visits.

The calendar

In July and August the ports are crowded and many islands restrict building work. That is why we plan island projects in winter and finish them in spring.

A house on an island? Start now

Tell us the island, the area and when the pool should be ready. We arrange ferries, crew and water so we make it before the season.

or call
+30 212 104 8320
+30 693 650 5824 WhatsApp · Viber

Xenofontos 112, 176 74 Kallithea, Attica, Greece
Google Maps →

or send the same message by: · ·

Your details are used only to reply to you.